ABOUT US
<
  • ● The company is a Grade A design institute with a Grade A design certificate for chemical engineering and a Grade A qualification for engineering consulting.


    ● Design covers 11 majors, applies domestic and foreign process calculation and engineering design software, adopts ASME, API and other international standards, and can simultaneously undertake EPC general package or engineering design capability of multiple large-scale installations.


    ● Registered capital of 200 million yuan






  • Strict access control;


    Each employee signs a confidentiality agreement;


    Confidential area monitoring;


    Internet behavior control and monitoring;


    Apply the leading edge document management system, all generated files are automatically encrypted


>
NEWS
  • Industry
  • The company
  • Media
  • 2019 - 03 - 18
    This week (3.11-3.15, the same below), domestic coal chemical products were mainly down, mainly due to the fact that the terminal was affected by environmental protection during the two sessions, the operating rate was not high, and sales were not warm.In terms of deep processing of coal tar, the downstream buying and selling atmosphere of coal tar is light, but the market supply is declining. The recent inventory decline is gradually decreasing. The market may stabilize and stabilize. In the long-term, there may be a rebound. Other small oil products are weak based on terminal demand, or still Will continue to be weak.In terms of pure benzene, the recent low center of gravity, hydrogenated benzene continued to decline due to suppression, low hydrogenated benzene also impacted the pure ben...
    • 2019 - 03 - 18
      This week (3.11-3.15, the same below), domestic coal chemical products were mainly down, mainly due to the fact that the terminal was affected by environmental protection during the two sessions, the operating rate was not high, and sales were not warm.In terms of deep processing of coal tar, the downstream buying and selling atmosphere of coal tar is light, but the market supply is declining. The recent inventory decline is gradually decreasing. The market may stabilize and stabilize. In the long-term, there may be a rebound. Other small oil products are weak based on terminal demand, or still Will continue to be weak.In terms of pure benzene, the recent low center of gravity, hydrogenated benzene continued to decline due to suppression, low hydrogenated benzene also impacted the pure ben...
    • 2019 - 03 - 18
      Basic analysis of coal chemical industryThe main industrial chain of coal chemical industry includes coal-synthetic ammonia-urea, coal-methanol-propylene/ethylene, coal-based ethylene glycol and so on. These end products are not only coal chemical, but also a product of the oil and gas chemical industry chain. In the case of rising oil prices and gas prices, coal prices are not booming during the peak season, and the price gap between the two continues to be deductive. The cost advantage of coal chemical industry will continue to be highlighted. In addition, based on China's energy endowment of “rich coal, lean oil and less gas”, and the pressure of importing large quantities of crude oil and natural gas for foreign exchange reserves, the strategic position of coal chemical industry is ind...
    • 2019 - 03 - 18
      In 2016, it became a turning point in the modern coal chemical industry. The Ministry of Environmental Protection approved the environmental impact report of six modern coal chemical projects, and the same period in 2015 was an embarrassing “zero approval”. Specifically, in the six projects approved by the Ministry of Environmental Protection in 2016, including the 1.8 million tons/year coal-to-oil project in Chang'an, Shanxi, and the indirect liquefaction demonstration of 2 million tons/year of coal in Inner Mongolia Yitai Coal-to-Liquid Co., Ltd. The project has a total of 2 coal-to-liquids projects; including CNOOC Datong 4 billion cubic meters/year coal gas project, Suxin Energy and Feng Co., Ltd. 4 billion standard/year coal-to-gas project, Inner Mongolia North Control 4 billion cubic...
    • 2019 - 03 - 18
      Although after the '12th Five-Year Plan' coal chemical development boom, but the coal chemical industry is still differently debated. At the 2015 China (Ordos) International Coal Chemical Development Forum and Exhibition held today, Gu Xiulian, vice chairman of the Standing Committee of the 10th National People's Congress, called for further clarification of the strategic position of the coal chemical industry, and included modern coal chemical industry as a key industry. Three-five plan.Gu Xiulian pointed out that people's understanding of coal chemical industry is not yet unified, there is controversy, and to develop an industry must have a national level of planning and layout, so it is important to define the important strategic position of coal chemical industry and to formulate indus...
    • 2019 - 03 - 18
      In recent years, China's modern coal chemical industry has made positive progress and outstanding achievements in terms of industrial scale and technological innovation. It has highlighted four major characteristics, namely, the continuous growth of industrial scale and the realization of safe and stable demonstration projects. Long-term operation, demonstration project energy consumption, water consumption and “three wastes” emissions have been declining, and technological innovation has achieved a number of new results.Four major characteristics in the development of coal chemical industry:First, the scale of the industry continues to grow. Since the “Eleventh Five-Year Plan”, especially during the “Thirteenth Five-Year Plan” period, modern coal chemical projects with coal-to-liquid, coa...
    PRODUCT
    /PRODUCT AREA
    Profession
    With a variety of industrial and civil boiler room design capabilities. Including the rapid loading or bulk burning of coal, fuel and gas, the heat transfer medium is the system design of steam, hot water and heat transfer oil boiler.Design capacity of a cogeneration plant with a power generation capacity of 30 MW or less and a thermal power plant (station)Energy-saving retrofit design capability for comprehensive utilization of waste heat from various chemical plants (including waste heat power generation, waste heat production steam, hot water)Design capabilities for all types of heating sta...
    CASE
    <
    >
    • Service Scope: General contracting for the project school simulation teaching training deviceContracting mode: process package development for model devices, DCS systems, simulation systems; engineering design; procurement, installation and training guidanceProject time: December 2012 to presentDesign features: The device simulates the scene, operation, control, sound, situation, color, etc. Close to the actual production of production to cultivate students' comprehensive ability and hands-on judgment.
    • Serial numberproject nameinvestmentstatus01Shanghai Hualin Industrial Gas Co., Ltd.Cogeneration Separation and Purification CO and H2 Plant Expansion Project (Phase III) Project Application Report270 million yuancarry out02Shanghai Chemical Industry Zone Shuchi Container (Shanghai) Co., Ltd.Industrial Packaging Project (Phase III)Project application report2.1 billion yuancarry out03Shanghai Hao Thermal Power Co., Ltd.Shanghai Qiu Thermal Power Co., Ltd. Huashui Phase II ProjectProject application report2.2 billion yuancarry out04Shanghai Hao Thermal Power Co., Ltd.Shanghai Hao Thermal Power Co...
    • Service Scope: Planning of Coal Chemical Industry Park in Beihu Industrial Zone, WuhanContracting mode: preliminary design depth of coal tar deep processing planningProject time: May 2012, December 2012Design features: The high-value-added coal tar downstream product of 10.7 billion output value was planned for Beihu Industrial Park, breaking the traditional technology of coal tar and winning high praise from users.
    • Scope of services: pipelines, electrical, instrumentation, fire protection design of warehouses and warehouses in the Baishawan reservoir area of Shanghai PetrochemicalContracting mode: design of the entire tank area renovation constructionProject time: March 2012, December 2012Design features: electrical, instrumentation, technology, fire protection and other professional realization of the integration of old and new systems
    • Service Scope: Design of Public Pipe Gallery in Nanchong Chemical Industry ParkContracting mode: feasibility study and construction drawing design of the entire park pipe galleryProject time: October 2012 to presentDesign features: introduction of advanced management and advanced management experience in the public management corridor of Shanghai Chemical Industry Park
    • Scope of services: whole plant engineering design, main equipment: cyclopentanone production equipment; cyclopentanone raw material purification device; tank areaContracting mode: joint development and engineering design of process packageProject time: August 2011 to presentDesign features: self-developed refinery by-products to extract cyclopentanone production process; high added value and advanced technology.
    • Service scope: whole plant engineering design, main equipment: synthetic base oil device; hydrogenation unitContracting mode: joint development and engineering design of process packageProject time: August 2011 to March 2013Design features: The country's first self-developed medium and high viscosity а olefin synthetic base oil (PAO), to achieve zero breakthrough in Chinese high-end base oil field.
    • Service range: 40,000 tons of phthalic anhydride plant full designContracting mode: process package development, engineering designProject time: September 2012 to March 2013Design features: naphthalene air catalytic oxidation fixed bed phthalic anhydride, independent research and development process package
    • Service range: methanol synthesis, methanol distillation, storage tank areaEngineering Design: Contracting ModeProcess package preparation, engineering designProject time: March 2007 to October 2009Design features: methanol synthesis tower using Kasari equipment; synthetic pressure 8.0Mpa: methanol distillation using 3 tower distillation process total investment of 2.3 billion yuan
    • Service scope: methanol synthesis, methanol distillation, storage tank engineering designContracting modeProcess package preparation, engineering designProject Time:March 2005 to December 2007Design Features:The methanol synthesis tower uses a Casari equipment;Synthetic pressure 8.0MpaMethanol rectification using 3 column distillation processThe total investment of the project is 1.8 billion yuan
    Links:
    Address: 8th Floor, 717 Yishan Road, Xuhui District, Shanghai
    Zip code:200233
    Tel:021-34289008
    Call:+86 0755-2955 6666
    Fax:021-34289009
    E-mail:ICCDI@ICCDI.COM.CN
    (Access Mobile)
    Copyright ©2019 - 2024 Innovative Coal Chemical Design Institute ( shanghai ) Co . Ltd
    XINIU
    犀牛云提供云计算服务