Source:
Release time: 2019 - 03 - 08
Service Scope: General contracting for the project school simulation teaching training deviceContracting mode: process package development for model devices, DCS systems, simulation systems; engineering design; procurement, installation and training guidanceProject time: December 2012 to presentDesign features: The device simulates the scene, operation, control, sound, situation, color, etc. Close to the actual production of production to cultivate students' comprehensive ability and hands-on judgment.
Source:
Release time: 2019 - 03 - 08
Serial numberproject nameinvestmentstatus01Shanghai Hualin Industrial Gas Co., Ltd.Cogeneration Separation and Purification CO and H2 Plant Expansion Project (Phase III) Project Application Report270 million yuancarry out02Shanghai Chemical Industry Zone Shuchi Container (Shanghai) Co., Ltd.Industrial Packaging Project (Phase III)Project application report2.1 billion yuancarry out03Shanghai Hao Thermal Power Co., Ltd.Shanghai Qiu Thermal Power Co., Ltd. Huashui Phase II ProjectProject application report2.2 billion yuancarry out04Shanghai Hao Thermal Power Co., Ltd.Shanghai Hao Thermal Power Co., Ltd. Industrial Water Plant ProjectFeasibility study report270 million yuancarry out05Henkel Chemical Technology (Shanghai) Co., Ltd. annual production of 140,000 tons of automotive, general indust...
Source:
Release time: 2019 - 03 - 08
Service Scope: Planning of Coal Chemical Industry Park in Beihu Industrial Zone, WuhanContracting mode: preliminary design depth of coal tar deep processing planningProject time: May 2012, December 2012Design features: The high-value-added coal tar downstream product of 10.7 billion output value was planned for Beihu Industrial Park, breaking the traditional technology of coal tar and winning high praise from users.
Source:
Release time: 2019 - 03 - 08
Scope of services: pipelines, electrical, instrumentation, fire protection design of warehouses and warehouses in the Baishawan reservoir area of Shanghai PetrochemicalContracting mode: design of the entire tank area renovation constructionProject time: March 2012, December 2012Design features: electrical, instrumentation, technology, fire protection and other professional realization of the integration of old and new systems
Source:
Release time: 2019 - 03 - 08
Service Scope: Design of Public Pipe Gallery in Nanchong Chemical Industry ParkContracting mode: feasibility study and construction drawing design of the entire park pipe galleryProject time: October 2012 to presentDesign features: introduction of advanced management and advanced management experience in the public management corridor of Shanghai Chemical Industry Park
Source:
Release time: 2019 - 03 - 08
Scope of services: whole plant engineering design, main equipment: cyclopentanone production equipment; cyclopentanone raw material purification device; tank areaContracting mode: joint development and engineering design of process packageProject time: August 2011 to presentDesign features: self-developed refinery by-products to extract cyclopentanone production process; high added value and advanced technology.
Source:
Release time: 2019 - 03 - 08
Service scope: whole plant engineering design, main equipment: synthetic base oil device; hydrogenation unitContracting mode: joint development and engineering design of process packageProject time: August 2011 to March 2013Design features: The country's first self-developed medium and high viscosity а olefin synthetic base oil (PAO), to achieve zero breakthrough in Chinese high-end base oil field.
Source:
Release time: 2019 - 03 - 08
Service range: 40,000 tons of phthalic anhydride plant full designContracting mode: process package development, engineering designProject time: September 2012 to March 2013Design features: naphthalene air catalytic oxidation fixed bed phthalic anhydride, independent research and development process package
Source:
Release time: 2019 - 03 - 08
Service range: methanol synthesis, methanol distillation, storage tank areaEngineering Design: Contracting ModeProcess package preparation, engineering designProject time: March 2007 to October 2009Design features: methanol synthesis tower using Kasari equipment; synthetic pressure 8.0Mpa: methanol distillation using 3 tower distillation process total investment of 2.3 billion yuan
All10numberPage number1/2HomePrevious page12Next pageTail page
Address: 8th Floor, 717 Yishan Road, Xuhui District, Shanghai
Zip code:200233
Tel:021-34289008
Call:+86 0755-2955 6666
Fax:021-34289009
E-mail:ICCDI@ICCDI.COM.CN
(Access Mobile)
Copyright ©2019 - 2024 Innovative Coal Chemical Design Institute ( shanghai ) Co . Ltd
XINIU
犀牛云提供云计算服务