Service scope: methanol synthesis, methanol distillation, storage tank engineering design


Contracting mode


Process package preparation, engineering design


Project Time:


March 2005 to December 2007


Design Features:


The methanol synthesis tower uses a Casari equipment;


Synthetic pressure 8.0Mpa


Methanol rectification using 3 column distillation process


The total investment of the project is 1.8 billion yuan


Related case
2019 - 03 - 08
Service Scope: General contracting for the project school simulation teaching training deviceContracting mode: process package development for model devices, DCS systems, simulation systems; engineeri...
2019 - 03 - 08
Serial numberproject nameinvestmentstatus01Shanghai Hualin Industrial Gas Co., Ltd.Cogeneration Separation and Purification CO and H2 Plant Expansion Project (Phase III) Project Application Report270 ...
Address: 8th Floor, 717 Yishan Road, Xuhui District, Shanghai
Zip code:200233
Tel:021-34289008
Call:+86 0755-2955 6666
Fax:021-34289009
E-mail:ICCDI@ICCDI.COM.CN
(Access Mobile)
Copyright ©2019 - 2024 Innovative Coal Chemical Design Institute ( shanghai ) Co . Ltd
XINIU
犀牛云提供云计算服务