Service scope: methanol synthesis, methanol distillation, storage tank engineering design
Contracting mode
Process package preparation, engineering design
Project Time:
March 2005 to December 2007
Design Features:
The methanol synthesis tower uses a Casari equipment;
Synthetic pressure 8.0Mpa
Methanol rectification using 3 column distillation process
The total investment of the project is 1.8 billion yuan