Service range: methanol synthesis, methanol distillation, storage tank area
Engineering Design: Contracting Mode
Process package preparation, engineering design
Project time: March 2007 to October 2009
Design features: methanol synthesis tower using Kasari equipment; synthetic pressure 8.0Mpa: methanol distillation using 3 tower distillation process total investment of 2.3 billion yuan